Roche ACCU-CHEK Inform II Operator's Manual Page 79

  • Download
  • Add to my manuals
  • Print
  • Page
    / 160
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 78
Linearity Testing
79
Performing a linearity test
Overview of test procedure A linearity test comprises the following steps:
Check the lot number of the linearity solutions.
Check the lot number of the test strips.
Perform the test with a minimum of three linearity
solutions.
Starting a linearity test The following description assumes that the meter is
powered on and the main menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The
Linearity Test screen opens.
Linearity Test
03/16/10
12:48pm
Use Linearity Lot 12345678?
Main Menu 12:48pm
03/16/10
Review Results
Control Test
Patient Test
Main Menu 2 12:48pm
03/16/10
Maintenance
Strip Lots
Prociency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
Page view 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 159 160

Comments to this Manuals

No comments